Section XIX: ABAP for SAP HANA. An example of the HANA project’s technical specifications

The following is an extension of our previous post, in which we provided a sample Functional Specification Document (FDD) from the SAP HANA project. Following their reading of the FDD article, readers are interested in seeing an example Technical Specification Document (TDD) up close. Permit me to reiterate. The SAP Projects documentation process is still the same. The TDD would be written in the same manner as before the HANA era.

So, if you’re a curious newbie to ABAP and HANA, please refer to the sample TDD provided below.It is not exclusive to ECC or HANA. Any SAP project can make advantage of it.Typically, during the first stages of a project, the document format is set.

PS: It is entirely accidental if there is any similarity to any real project document—alive or dead, ongoing.

We hope that our ABAPers would feel more confident after reading this technical specification. Not much has truly changed in terms of documentation. It is the same wine in a different project, as we previously stated.

See Also: “ABAP for SAP HANA” Important Notes

SAP HANA from Space Level for HANA Novices (Technical, Non-Technical, and Non-SAP)

Are you still unclear about HANA’s Views? Look at this:View the HANA Views from various perspectives.

Please SUBSCRIBE if you would want to receive such helpful articles straight to your email. We take seriously our responsibility to protect your privacy.

Thank you for your time.

  • Related Posts

    SAP XI/PI – Invoice Attachment Transfer from ARIBA to VIM

    The documents that are connected to the invoice in the Ariba Network system should be transferred to the VIM system via PI Integration as part of the Ariba Supplier Invoice…

    Attachments for SAP XI/PI – ARIBA Invoices sent via PI to S/4HANA

    Integration with SAP systems has never been more intriguing, especially with Ariba, Workday, Concur, Successfactors, Fieldglass, Hybris, and other satellite cloud solution vendors banging on doors every day. 🙂 I…

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    You Missed

    SAP XI/PI – Invoice Attachment Transfer from ARIBA to VIM

    • By Varad
    • November 8, 2024
    • 3 views
    SAP XI/PI – Invoice Attachment Transfer from ARIBA to VIM

    11 Steps to Include a New Field in an Already-Existing SAP LSMW Batch Input Recording

    • By Varad
    • November 6, 2024
    • 3 views

    Part 23 of ABAP for SAP HANA. How Can AMDP Be Used to Access Database Schema Dynamically?

    • By Varad
    • November 4, 2024
    • 3 views

    S/4HANA VDM 1 Employing CDS Virtual Data Model for Embedded Analytics

    • By Varad
    • November 1, 2024
    • 5 views